The complete vertical module for industrial production with in-house and outsourced work phases:
- Multilevel Product Bills of MaterialsEach product has its bill of materials, the list of components and semi-finished parts it is made of, and each semi-finished part can in turn have its own bill, across as many levels as needed: requirements and costs are calculated right down to the last raw material.
- Bill of Materials version archiveWhen a product changes, the new bill of materials sits alongside the previous one instead of replacing it: earlier versions stay archived and can be consulted, so you always know how the product was made at any given time.
- Assembly/Setup Group ManagementSubassemblies of components fitted together and the equipment needed to set up a machine are handled as groups: defined once and recalled wherever they are needed, instead of listing every single element each time.
- Substitute and End-of-Stock ItemsFor each component you specify the alternative items to use when it is unavailable, and those being phased out, to be used up before switching to the replacement: fewer stoppages for missing materials and less unused stock.
- In-house and outsourced work cyclesThe work cycle sets out the sequence of phases needed to make the product: each phase takes place in an in-house department or at a subcontractor, with its own rates, so you know in advance where the material will go and what each step will cost.
- Management of workers, machines and cost centresWorkers and machines are the resources that carry out the work phases, while cost centres collect costs by department: you know who did the work, on which machine, and what each phase cost.
- Smart machine-side interfaces for work progress trackingOperators record phase progress and quantities produced right on the shop floor, with simple screens designed for use at the machine: the office sees an up-to-date picture with no paperwork to re-key.
- Material Planning (M.R.P. II)Starting from orders and production schedules, requirements planning works down through the bills of materials and calculates which materials are needed, in what quantity and by when, net of stock, expected receipts and minimum stock levels, and proposes the purchases to make.
- Production Planning (M.P.S.)The master production schedule sets out in advance which finished products to make, in what quantity and in which period, based on orders and sales forecasts: it is the starting point from which material requirements are calculated.
- Immediate Production Feasibility calculationYou can check in real time how many units of a product can be made straight away with the materials available, and which components are missing: a quick answer for the customer before confirming a delivery.
- Purchasing Budget ControlMaterial purchases are compared with the planned budget, so variances come to light early and you can act before exceeding the planned spending.